MFH Walenstadt, Planung HLS, Platzrütistrasse 9, 8880 Walenstadt

Estimated construction sum:
CHF 630’000

Owner:
Maler Hauser, Näfels

Represented by:
Heka Bauleitungen AG

Architect:

Realization period:
October 2018 – August 2019

Overall planning for:

  • Design, heating and design SHL
  • Installation SHL
  • Floor heating
  • Garage ventilation with moisture absorption and heat recovery