MFH Walenstadt, Planung HLS, Platzrütistrasse 9, 8880 Walenstadt
Estimated construction sum:
CHF 630’000
Owner:
Maler Hauser, Näfels
Represented by:
Heka Bauleitungen AG
Architect:
–
Realization period:
October 2018 – August 2019
Overall planning for:
- Design, heating and design SHL
- Installation SHL
- Floor heating
- Garage ventilation with moisture absorption and heat recovery